FASTER FOOTINGS Free Trial Available
Faster Install, Faster Pouring, Faster Stripping
SPEED UP FOOTING AND FOUNDATION WALL CONSTRUCTION
HOW WE DO IT
Step 1: Determine Location
Locate edge of rebar mat - Whether 2" from wall form location or center of footing.
Step 3: Install Rebar
Installation of wall horizontals wire tied to brackets and dowels with vertical wall reinforcing installed as one piece.
Step 2: Attach Bracket to Spreader
Attach the brackets with two screws to the spreader in the measured locations
Step 4: Pour
Faster concrete placement and finishing due to 3” clearance above footing concrete. Remove two wire ties and two screws and remove from forms.
2012
Year Established
21
Contractors using FF Brackets
2,627
Brackets Sold
60%+
Contractor Repurchase Rate
PROJECTS
CLIENTS
CONTACT
Inquiries
For any questions or comments,
please call 507-340-7214