SPEED UP FOOTING AND FOUNDATION WALL CONSTRUCTION

HOW WE DO IT

HOW WE DO IT

Step 1: Determine Location

Locate edge of rebar mat - Whether 2" from wall form location or center of footing.

Step 2.PNG

Step 3: Install Rebar

Installation of wall horizontals wire tied to brackets and dowels with vertical wall reinforcing installed as one piece.

Step 2: Attach Bracket to Spreader

Attach the brackets with two screws to the spreader in the measured locations

Step 3.PNG

Step 4: Pour

Faster concrete placement and finishing due to 3” clearance above footing concrete. Remove two wire ties and two screws and remove from forms.

2012

Year Established

21

Contractors using FF Brackets

2,627

Brackets Sold

60%+

Contractor Repurchase Rate